請選擇 進入手機版 | 繼續訪問電腦版

Ohworld

 找回密碼
 立即註冊
搜索
熱搜: 活動 交友
查看: 959|回復: 8

印尼加里曼丹中部礦區--遠,食人族村落,僅船可行

[複製鏈接]

78

主題

88

帖子

3528

積分

管理員

Rank: 9Rank: 9Rank: 9

積分
3528
發表於 2017-8-16 10:07:32 | 顯示全部樓層 |閱讀模式
加里曼丹為世界第三大島,為印尼所屬,目前人口不到千萬
該島大部分仍屬農礦區 這個投資案位於加里曼丹中部 看銅礦藏量豐富,只是地處偏遠,冶煉,開發和出售過程較困難.
目前銅現價 6500美元/噸  月產出量 100噸左右 估計年報酬率至少在100%,應該是相當不錯的投資機會

詳細計畫如下

SUMMARYMINING AND
PROCESSINGFACTORY AND COPPER PURIFICATION
採礦與銅礦精煉廠的摘要

Company name公司名稱  
  
:
COOPERATIVEMINES OF THE INDO NOBLE PEOPLE  
Address地址
  
:
Sumber Barito District  Murung Raya District, Central Kalimantan Province, Indonesia
Location of mine and factory礦及工廠地址
:

位於印尼加里曼丹島中部


The width of the mine area is a stretch
  
礦脈登錄及面積
:
• Area 1: 24.93 ha
24.93公頃
  
• Area 2: 24.28 ha
24.28公頃
  
• Area 3: 23.03 ha
  
23.03公頃
  
• Area 4: 24.14 ha
  
23.03公頃
  
Total mine area: 96,38 ha
  
總面積 96.38公頃
Assets owned
  
資產擁有情況
:
• 8m x 10km of land for mining road
  
8mX10km礦區的路
  
• 300m x 600m of land on the banks of the  Barito River is planned for ports and factories
  
300mX600m要規劃成工廠和港口
  
• 200m x 200m mountain soil contains basalt  rocks for road and building construction
  
200mX200m要規劃路和建築
  
• 96.38 ha of mine area land
  
96.38公頃的礦區
  
• 750m2 of land in Puruk Cahu for transit  office and mess
  
750m2的辦公室
  
• 400m2 of land in Banjarmasin for transit  office and mess
  
400m2的辦公室
Funds that have been issued
  
已登記資本
:
Rp. 2.125.000.000, - (Two Billion One Hundred Twenty Five Million Rupiah)-around 200,000 US Dollar  
20萬美金
  

  With the following details :
  
1. Feasibility Study Cost Rp. 200.000.000, -
  
2. Mining license fee Rp. 500.000.000, -
  
3. Borrow using the road houling 8m x 10.000m  x Rp.3.000, - Rp. 240.000.000, -
  
4. Purchase of land
  
A. Port and factory area 300m x 600m x Rp.3.000,  - Rp. 540.000.000, -
  
B. Rock basalt area 200m x 200m x Rp.5.000, -  Rp. 200.000.000, -
  
C. Mining area 96.38 ha x Rp.50.000.000, -  Rp. 100.000.000, -
  
D. Office and mess in purukcahu 15m x 50m x  Rp.300.000, - Rp. 225.000.000, -
  
E. Office and mess at banjarmasin 20m x 20m x  Rp.300.000, - Rp. 120.000.000, -



REFERENCE OF MINING PROJECTS AND COPPER PROCESSING礦的開採與現況
Data Mining
A.  Mine Data Feasibility Study Report from ITS Surabaya Metallurgy FocusTeam Team Leader: Sungging Pintowantoro, ST, MT, PhD NIP. 196809302000031001 /Tech.Material & Metallurgy / FTI / ITS Team Member: Anton Wijaya, ST NIP.198107172009031001 / Tech.Material & Metallurgy / FTI / ITS YuliSetiyorini, ST, Mphil. NIP. 197907242005012003 / Tech.Material & Metallurgy/ FTI / ITS
礦脈可行性分析請參照以上團隊所出具報告

Estimated deposit:From the exploration results that have been conducted based on outcrop, tracing and core drilling data and other supporting data, the estimated prospective reserve volume for the mining area is 200 hectares, the estimated prospective reserve ) In the study area is 165,600 m3 or 473,616 ton (BJ: 2,86 mVton), with degree of confidence of 65%, the measured reserve is 473,616 x 65% = 307,850 ton. As for galena reserve with BJ: 11.2 mVton is 1,894,464 tons, with the same level of confidence, the measured reserves are 1,894,464 x 65% = 1,231,401 tons.From the results of the satelite image we do get the Cu sediment recording which is much larger than the previous calculation. This is because in satellite imagery, the sediment is still spreading, it will look like thick. The results we get from satelite imaging, there are only 25% who have Cu deposits. When multiplied by Eid and 100 meters depth, 650,000 tons of sediment is obtained, while for galena, not much different, due to the nature of the groove and the spread of a little propiry, obtained 1,425,000 tons of sediment. 估計存量:由探勘結果可知估計礦脈約有200公頃 ,165,600m3的研究範圍內(473,616) (BJ: 2,86 mVton),可探測出65%的含量,也就是307,850. 同樣的方鉛礦約1,231,401.從衛星探測圖來看銅的沉積物存量遠高於上述的數值,因為從衛星圖來看礦脈還再延伸而且看起來更深.看起來深度到100公尺,可推測銅沉積物應有650,000.方鉛礦有1,425,000沉積物.
Types of Rock in Makap Stone containing Cu:
礦脈所含的各種銅
Chovelite(Cu(OH)2) 氫氧化銅                   Native Cu kadar 99.99%自然銅
Levels 5% - 22%                    


Chalcopyrite(CuFeS2)黃銅礦                     Cuprite (Cu2O)赤銅礦,含銅88.8%
Level 8% - 12%(銅鐵硫化礦,微量金可煉鋼)               Level 40% - 60%



Malachite(Cu2(OH)2CO3)孔雀石      Cuprite (Cu2O) 赤銅礦
Level 10%                                       Level 90%



A.   Data Processing and Purification of DirectBearing System Cu Processing Machine with combustion method:
第一階段煉銅-火法 各種機台如下
Tromol(罐)                                     JawCrusher(顎式破碎機)


Mini kupola                                   Crusible

Kupolabesar         (鐵爐)                      Panggung hupola


Combustion Process of Cu rockThe raw material burning documentation or more refining we save in video file format
第二階段煉銅的機台-火法
Crusible                                           Panascrucible 1187oC(加熱鉗鍋)


Result of burning
Results from kupola (first burning)第一階段產品(冰銅)
Crusible result
第二階段成果-粗銅

Results from Crusible(second burning)

Cu bars
最終產品-銅條










回復

使用道具 舉報

78

主題

88

帖子

3528

積分

管理員

Rank: 9Rank: 9Rank: 9

積分
3528
 樓主| 發表於 2017-9-8 08:15:38 | 顯示全部樓層
回復 支持 1 反對 0

使用道具 舉報

您需要登錄後才可以回帖 登錄 | 立即註冊

本版積分規則

Archiver|手機版|小黑屋|Ohworld  

GMT+8, 2024-3-29 17:39 , Processed in 0.061617 second(s), 21 queries .

快速回復 返回頂部 返回列表